Quantcast
Channel: SmartClient Forums
Viewing all articles
Browse latest Browse all 4756

Problem repositioning timeline events

$
0
0
SmartClient Version: v10.0p_2015-01-02/Pro Deployment (built 2015-01-02)

I have run into a problem when drag-repositioning a calendarEvent that has a startDate which is before the time range that the timeline currently showing.

When I drag the event it acts as if it's startDate is the beginning current time range shown even though is has a startDate that is weeks before that.

Imagine the timeline is showing the month of January and you have a 3 week long event stretching 1 week into January. The timeline will ofcourse only show the last week of the event stretching into January, but if I want to drag the event 1 week to the right (so that 2 weeks would be stretching to January) it seems like the timeline treats it as a 1 week event and the new startDate and endDate sent to the server are only 1 week apart. This means that I have turned a 3 week long event into a 1 week long event by dragging the whole event 1 week to the right.

Viewing all articles
Browse latest Browse all 4756

Trending Articles